Roof Replacements
There are a few steps to properly replacing and installing your
new roofing products.
Step one: Meeting and measuring
- Set
up a time to meet with you, measure your roof, identify your needs, and go
over all details with you
- Upon
signing a contract and receiving a deposit we then start the production part
of the process
- All
required materials are entered into our computer data base so our production
department can start the ordering process
- All
installation paperwork and instructions are now generated for the
installation crew
Step two: Delivery and installation.
- You
will be notified with an install date as well as a material delivery date.
The material will be delivered a few days before the installation. In most
cases the material will be “roof topped” but in some situations we will
need to drop the material on the ground. In either situation all vehicles
need to be removed from the driveway so we can have complete access to your
roof.
- Weather
is the largest factor in determining an install date. We can typically get
to your roof within a 3 week period, beating most other roofing companies
time frame and most installs take less then 2 days to complete.
- We
may use a dump truck or a dumpster for the debris so complete access is
required of your driveway during normal business hours.
- Our
crews use tarps to protect your home as well as your landscaping.
- After
removing all of the existing materials our crew will inspect the existing
roof decking material for damage. If there is a need to replace any decking
you will be contacted prior to replacing the material.
- Your
new shingles will now be installed using the most modern tools and
techniques. There are areas of modern homes that require special attention
and material, our trained roofing specialist has talked with you during step
one about these needs and our certified master mechanics have been trained
to properly install the materials to protect your home.
- We
remove all debris form you home as well as “magnet” roll the entire
area. We pride ourselves in our clean up, however, please be aware that tons
of material has been removed from your home.
Step three: Inspection and final payment
- Your
roof will be inspected by our sales manager. Our 36 plus years of serving
the roofing community’s need have allowed us to formulate a final
inspection list to make certain the “trouble” areas are handled
properly. If there is something that needs to be addressed it can be handled
efficiently.
- After
final inspection is completed and you are happy with the completed project
now and only now will we ask for a final payment